Construction Update: Movie Animation Park Studios, Malaysia

Having heard that this theme park under construction in Ipoh, Malaysia is not opening in December as planned but probably in April 2017, I thought I would stop by on my way to Penang over the end-of-the-year break to report on the status of construction and share a few pictures.

The entrance building and car park were finished early 2016 and it seems most of the rides have been delivered by now. The theming in Animation Square is almost done and you can actually see it from the highway itself. I wonder if that will be covered later as I don’t think visitors of the park want to see the highway from the square! It looks like the structure for the stunt show is also done. The main areas requiring more work are probably the Dreamworks Zone and the Blast Off Zone.

img_0007_2

View from the main entrance building of the bridge, Animation Square and Megamind Megadrop at the back

img_0006_2

View from the main entrance of Fantasy Forest at the front and Stunt Legends structure at the back

img_0005_2

Panoramic view from the entrance building

img_0003_2

View of the starship restaurant being built in the Blast Off Zone

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s